
Vergangener Start
LVM-3 | Chandrayaan-3
Erfolg 14.07.2023, 14:35 (Ortszeit am Startplatz)
Chandrayaan-3 is India's third mission to the Moon. It repeats most of the failed Chandrayaan-2 mission, with only a lander and rover. After a controlled descent, the lander will perform a soft landing on the lunar surface at a specified site and deploy the rover. The six-wheeled rover weighs around 20 kg and will operate on solar power. It will move around the landing site, performing lunar surface chemical analysis and relaying data back to Earth through the orbiter. The lander will be collecting data on Moon-quakes, thermal properties of the lunar surface, the density and variation of lunar surface plasma. Altogether, the Chandrayaan-3 mission will collect scientific information on lunar topography, mineralogy, elemental abundance, lunar exosphere and signatures of hydroxyl and water-ice. (Original, deutsche Fassung folgt)
Launch Vehicle Mark-3 (GSLV Mk III)
Karte laden (OpenStreetMap)Kartenvorschau: The Space Devs · Interaktive Karte: OpenStreetMap (laedt erst nach Klick)
- 14.07.2023 Launch success confirmed (Original, deutsche Fassung folgt)
- 14.07.2023 Abheben
- 14.07.2023 Livestream has started (Original, deutsche Fassung folgt)
- 13.07.2023 Added T-0 seconds. (Original, deutsche Fassung folgt)
- 06.07.2023 GO für den Start.
- 05.07.2023 Delayed to July 14 per NOTAM A1845/23 (Original, deutsche Fassung folgt)
- 28.06.2023 Updated T-0. (Original, deutsche Fassung folgt)
- 28.06.2023 NET July 13, per NOTAM A1766/23 (Original, deutsche Fassung folgt)
Quelle: Launch Library 2 (The Space Devs)
← Zurueck zum Startkalender · Zum Archiv